Yellow River Bridge and Connecting Line Project of Mengzhou to Yanshi of National Highway 207
The 4th Engineering CO., LTD. of CCCC 1st Highway Engineering CO., LTD.
Project Introduction
The Yellow River Bridge and Connecting Line Project from Mengzhou to Yanshi of National Highway 207 is one of the Top Ten Infrastructure Construction Projects in Mengzhou City in 2018. The project adopts the technical standard of two-way six lane first-class highway, with a subgrade width of 33m and a design speed of 80km/h. The total investment of the project is 2.36 billion yuan, the construction period is 36 months, and it is expected to be completed and opened to traffic in June 2021.