SG4 of Phase I of Civil Engineering of Wenzhou Suburban Railway Line S2
China Railway No.3 Engineering Group CO., Ltd. The Fifth Engineering Co., Ltd.
Project Introduction
The project starts from Xiatang Station, Chengdong Street, Leqing City, and ends at Renmin Road Station in Ruian City. The total length of the line is 63.63km. It is a key channel for rapid connection of coastal industrial development belt in the core area of Wenzhou metropolis in the future.