兴土 兴土
Project Introduction
The project starts from Xiatang Station, Chengdong Street, Leqing City, and ends at Renmin Road Station in Ruian City. The total length of the line is 63.63km. It is a key channel for rapid connection of coastal industrial development belt in the core area of Wenzhou metropolis in the future.

share: